Seaport Community Church is doing a living nativity this year. I've taken charge of construction of the sets Once I finalize the plans and get a budget, I'll be looking for help with construction. I'm also looking for framing and brad nailers, jig-saw, and maybe an air paint sprayer. I'll keep everyone posted on when the work will be going down.
-
I'm in!
-
Just let me know when you get some times. I will only be in Connecticut until the 18th and then won't be back until January 4th.
-
inital construction will probably take place in my garage (heated, covered) due to weather. I've drawn up schematics and am just waiting for a budget ($$). I'll post the times for work, and if you can make it, GREAT!
-
I'm in
-
i'm definately in
-
With the power outage today, class was cancelled, and now I have a test on Monday, so I need to study this weekend. If I can't help, I can lend a air powered framing nailer and a finish nailer. Let me know if you still need some.
-
With the power outage today, class was cancelled, and now I have a test on Monday, so I need to study this weekend. If I can't help, I can lend a air powered framing nailer and a finish nailer. Let me know if you still need some.
I may just call you on that. Not till monday, at least.
-
I'm hitting Home Depot first thing in the morning, and could use help loading/unloading the lumber (30 2x4s, 5 sheets plywood, fastners, stain, etc), and inital construction. It will be in my garage (heated). I could use a framing nailer and jigsaw/sawsall if someone can lend. feel free to call me: 808-554-8859
-
I have meeting after meeting at work today and then I have basketball practice after work. Today's not good for me at all.
-
So i have the most lumber I've ever had in my garage: 30 8' 2x4s and 7 sheets of plywood. Plus the fastners/joints. Glad I have a trailer!!!
-
I have basketball practice tonight as well. I may be able to help some tomorrow night. Wednesday I have to work late. I should be available to help from Thursday on.
-
::) Jeremy bragging about his wood....KEEP IT TO YOURSELF!!!!!!!!!!!!!! Or get a room...LOL
-
::) Jeremy bragging about his wood....KEEP IT TO YOURSELF!!!!!!!!!!!!!! Or get a room...LOL
LOL
I have plans tues and wed night, so will be working during the day. Thurs I will need help w/ transport, some prop cutting, and paint. Most of the construction will be done tomorrow. Inital pics are up on my webshots page (http://community.webshots.com/user/elcamino73?vhost=community).
-
Update: All major construction is complete. I just have to add some braces to streangthen the roof (since it is in two peices, I don't want it to break during transport or assembly. Tomorrow morning I will finish all construction (I have to hit HD again for more supplies and to return stuff I don't need) If someone is availve tomorrow during the day I could use help with staining and some prop construction. I plan on moving everything over thrusday as early as possible. I want to assemble the manger to ensure there are no problems.
If any one can help tomorrrow at any point till 6pm or anytime thursday, call/text me @ 808-554-8859. I would like to at least get most of the staining done tomorrow, if possible.
-
I will be able to help Thursday afternoon/evening. I will call you when I am available.
-
as of 5pm today, all major construction is done. All that is left is to make a couple of camal silluetes, stain the while thing and get it to the church and set it up! There will be some work to do there (the walls will need to be attatched and painted. the walls will be framed canvas stuff used in theater props.
-
all off-site construction is complete, including 2 camels! Stain/paint process begins!
-
all painting and staining have been complete!! Thanks Justin!! Tomorrow is transport and setup. If anyone is availible, we will be starting at about 0830 at my house to load up, then to the church to set up. I can use help at both locations.
-
all construction is done and the stable is set up for display at the church. come take a look during the Living Nativity Monday and Tuesday night! It was snowing and i had to go get a trailer from uhaul so I didn't get any pics of the completed assembly. Maybe tomorrow I will and post them. Better to see it in person Monday or Tuesday!
Thanks to Justin today. no way i was assembling it w/o help!
-
all construction is done and the stable is set up for display at the church. come take a look during the Living Nativity Monday and Tuesday night! It was snowing and i had to go get a trailer from uhaul so I didn't get any pics of the completed assembly. Maybe tomorrow I will and post them. Better to see it in person Monday or Tuesday!
Thanks to Justin today. no way i was erecting it solo!
Oh boy... You just opened a big can o' worms... :-[
:o
-
First it was wood in his garage, then erection something or other... You left yourself open for that Jeremy...LOL
-
all construction is done and the stable is set up for display at the church. come take a look during the Living Nativity Monday and Tuesday night! It was snowing and i had to go get a trailer from uhaul so I didn't get any pics of the completed assembly. Maybe tomorrow I will and post them. Better to see it in person Monday or Tuesday!