Rich gave me a hard time today for not having been on the forum in forever, so here is an update on my Jeep.
It is almost back together from the frame and tub swap. The drive train is all in and the fuel injection all wired back up. It actually started on the first attempt which was nice. I went back to using a gas tank under the Jeep, instead of the fuel cell so that I can have a back seat for my son. So the big things left to do are brakes, exhaust and install the roll cage. Once all that is done it will be time for paint. If anybody feels like helping you can stop by any time, the garage door is always open.