The Mud Pit > Wrenching
Next Wrench Day
calvynandhobbs:
Congrats on getting the work done and wow, 37s?
Mr Rock:
--- Quote from: JKJon on September 22, 2013, 02:25:03 AM ---We got my front axles sleeved, All in all it went really smooth. Some serious pounding with a 10 lb sledge hammer for about 25 minutes just on one side, but they eventually went all the way in. (these were the Nitro weldless bang in axle sleeves) Trust me, these things are never gonna move.
--- End quote ---
This is what it looks like after they were installed.
Mr Rock:
And this is what the "special" tool I made looked like by the time we were done pounding on it!!
I used 1-1/4 pipe and 3/8 plate steel on either end!!
It started to mushroom at each end before it bent!!
That was some serious pounding to get them in all the way!!
skibum:
Maby a bigger hammer was needed. Lol
Great job. Glad to say I was not there to help cuz my back would be a total wreck after swinging a hammer like that.
Mr Rock:
We broke the first 10lb sledge and luckily the second made it to the end!
John did most of the swinging I wonder how sore he was/is???
Navigation
[0] Message Index
[*] Previous page
Go to full version